Type 4 General Permit & Liquid Effluent Collection System (LECS) Fees
Permits by rule issued for sewage collection systems and on-sites (septic systems). These fees are subject to an annual adjustment and will be updated on this page annually.
|
Water Quality Protection Service |
Description |
Permit Fee |
|
4.01 General Permit: Sewage Collection Systems |
Under each Notice of Intent to Discharge, the fee is assessed on a per-component basis for the components listed below and is assessed cumulatively up to the maximum fee:
|
$37,140 $1,480 $1,480 $1,480 $1,480 $1,480 $1,480 $740
|
|
4.01 General Permit courtesy review |
If an applicant requests a courtesy review, the Department shall approve or deny the request. When determining whether to approve a courtesy review request, the Department shall consider the complexity of the project and the Department’s current workload |
One-third of the applicable fee upon submittal, then the balance of fee if Notice of Intent to Discharge is submitted with final documentation within 180 days of first submittal |
|
4.23 General Permit: 3,000 to less than 24,000 Gallons per day Design Flow |
Onsite wastewater treatment facility with up to: Three treatment technologies and disposal methods consisting of technologies or designs that are covered under other Type 4 general permits and Two onsite wastewater treatment facilities
Maximum fee (cumulative)
|
$5,340
$11,140
$1,780
$740 |
|
4.23 General Permit annual report |
Annual report required under A.A.C. R18-9-E323(G) |
$290 |
|
Type 4 General Permits (4.02 through 4.22) |
|
$5,490
|
|
Alternative Design under A.A.C. R18-9-A312(G) |
A request for an alternative design, installation, or operational feature per alternative design:
|
$1,100 $370
|
|
Interceptor under A.A.C. R18-9-A315 |
A design requiring an interceptor (per interceptor) |
$140 |
|
Transfer |
Transfer of discharge authorization |
$70 |
|
Priority Review |
If an applicant requests priority review, the Department shall approve or deny the request. When determining whether to approve a priority review request, the Department shall consider the complexity of the project and the Department’s current workload. |
Double the Applicable Fee (including any applicable maximum fee) |
|
Liquid Effluent Collection System General Permit |
Permit Fee |
|
Maximum fee |
$36,670 |
|
Gravity lines with design flow less than or equal to 2,999 gpd |
$1,470 |
|
Each additional increment of 15,000 gpd or less of gravity line |
$1,470 |
|
Pressure lines with design flow less than or equal to 2,999 gpd |
$1,470 |
|
Each additional increment of 15,000 gpd or less of pressure line |
$1,470 |
|
Each pump tank |
$1,470 |
|
Each Alternative Design, Installation, Operational Features request |
$1,470 |
|
Liquid Effluent Collection System General Permit |
Annual Fee |
|
Collection system with design flow less than or equal to 2,999 gpd |
$1,470 |
|
Each additional increment of 15,000 gpd or less of gravity sewer |
$1,470 |
The review of proprietary and other reviewed products under A.A.C. R18-9-A309(E) is subject to hourly fees of $180 per hour and has a maximum fee of $22,280.