Skip to main content
VRP Site

Arizona Copper Company

Revised On: Mar. 3rd, 2026 - 02:10 pm

Location: 

  • US Hwy 191 and Zorilla Street, Clifton, Arizona

Acceptance Into Voluntary Remediation Program (VRP):

  • Jan. 24, 2001

Contaminants of Concern (COCs):

  • Metals from historic mine smelter emissions

Affected Media:

  • Soil

What are My Health Risks:

For Soil | There is little to no health risk unless there is contact with skin or ingestion of contaminated soil

Site Summary:

  • Engineering controls in the form of engineered caps and drainage systems have been utilized onsite to eliminate exposure.
  • Site is currently inspected on an annual basis and after major rain events.
  • Inspection Reports are submitted annually.

Project Manager
P: 602-771-2256
Email >


VRP Unit Manager
P: 602-771-1612
Email >